The Nanisivik Naval Facility is a Canadian Forces naval facility which is to be constructed on Baffin Island, Nunavut. The station will be built at the former lead-zinc mine site near the former company town of Nanisivik. ==History== The community of Nanisivik was built to support the Nanisivik Mine, a lead-zinc mine on Baffin Island. The mine was serviced by a jetty for receiving ocean freight, later used by the Canadian Coast Guard for training,〔(【引用サイトリンク】 url=http://www.arcticnet-ulaval.ca/index.php?fa=News.showNews&home=4&menu=55&sub=1&id=244 )〕 and the Nanisivik Airport, which was capable of receiving jet aircraft and closed in 2011. Falling metal prices closed the mine in 2002.〔 〕 On 8 August 2007, CBC News reported that Canadian Forces documents showed plans to convert the site into a naval station. The plan would turn the former mine's existing port into a deepwater facility at a cost $60 million although total costs in 2011 were set at $175 million with an extra $12 million for the design.〔 (mirror )〕〔 On 10 August 2007, Prime Minister Stephen Harper announced construction of a new docking and refuelling facility at Nanisivik for the Canadian Forces, in an effort to maintain a Canadian presence in Arctic waters during the navigable season (June–October). The choice for Nanisivik as a site was partially based on its location within the eastern entrance to the Northwest Passage, via Admiralty Inlet, and the existence of a deep-water berthing facility at the site, as well as a location of the airport. The United States Air Force's Thule Air Base is 600 km to the northeast. Detailed planning for the project began in August 2007, with environmental studies and assessments being carried out in the summer of 2008.〔 (mirror )〕 On 20 August 2010, the Kingston-class coastal defence vessel became the first Canadian warship to secure to the Nanisivik jetty as part of Operation Nanook. Two days later, the frigate secured alongside for a photo opportunity. The Coast Guard icebreaker was also present, but did not go alongside at that time. In 2011 and 2012, the government started backing down on the Nanisivik conversion plans, explaining that construction in the far north is too expensive. The station will be primarily used for refuelling Arctic patrol and other government vessels. The port's operational time was also scaled back to just a four-month period in the summertime. Construction was expected to begin in 2013, with the station operational by 2016. However, construction delays continued and the opening of the port was put off until 2017 with the intent to be fully operational by 2018.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Nanisivik Naval Facility」の詳細全文を読む スポンサード リンク
|